1. I do not find the answer to my question?
2. I need information about Products of Tri Viet Steel Buildings?
3. Preserving materials before erection?
4. Things to note when pre-engineered steel erection?
Reply
1. I do not find the answer to my question.
Use the contact form here to ask questions and we will answer you as soon as possible.
2. I need information about Products of Tri Viet Steel Buildings
The products of Tri Viet Steel Buildings are regularly updated in product categories
3. Preserving materials before erection
These products are moving away from the factory in good condition. To maintain this condition, we recommend to beam plate, hand blow or gutters be kept 150 mm above the ground with 1:25 slope allows water to drain.
Covering up the stack by a map sheet waterproof coat, open end to help air circulation. Upon receipt of materials, we recommend you check beam Panels. If water is retained between the plates, the plates should be dried carefully and then rearranged to have air circulation.
Panels should be installed as soon as possible after delivery. Stored at the location no longer good.
Tri Viet Steel Buildings not responsible for the colored galvanized products, or aluminum, or damage caused by products Paint store at the location incorrectly.
4. Things to note when pre-engineered steel erection
• Inspect all lifting equipment daily
• Check the power lines above prior to the cranes move
• Check weather conditions, strong winds are dangerous to mount up and up without pads
• Check all cable upgrade, check that the wires are twisted or not stripped of every day
• Check that all access equipment is in good condition or not, including scaffolding and ladders
• Ensure materials are stored properly
• Check that all workers have full erection devices such as personal safety department of labor safety helmets, shoes, the belt, etc..
• Check the cable for the instruments by hand, have frayed, do not open or short.
• Be sure to include the ligaments in place to temporarily reinforced
• Ensure the installation always start up in time were bracing
• Ensure that high-intensity Bolt fit together properly
• Ensuring high-intensity Bolt was used where indicated
• Ensure temporarily reinforced edges and pulling the wire was installed when starting work
• Keep the site neat and clean, thus avoiding the loss of materials and accidents
• Scan the roof panels end of each working day, drilling will corrode panel mites if not cleaned
• When walking on the roof of the panels go on the track rather than go on the zone
• Use the correct tool for each job, the wrong tools and materials will be destroyed to create works of inferior quality.
• Finally, get all the insurance risk of the contractor because the risk is unavoidable.